Last edited by Aragor
Thursday, August 6, 2020 | History

1 edition of Preliminary feasibility report on augmenting Maskeliya Oya catchment for additional energy production found in the catalog.

Preliminary feasibility report on augmenting Maskeliya Oya catchment for additional energy production

Preliminary feasibility report on augmenting Maskeliya Oya catchment for additional energy production

  • 284 Want to read
  • 18 Currently reading

Published in [ ], 1977 .
Written in English


Edition Notes

Statementprepared for Ceylon Electricity Board, Ministry of Irrigation, Power & Highways by Irrigation Department, Colombo, Sri Lanka.
Classifications
LC ClassificationsMLCM 83/4255 (T)
The Physical Object
Pagination35 leaves, [7] leaves of plates (6 fold.) : ill. ; 30 cm.
Number of Pages35
ID Numbers
Open LibraryOL4440726M
LC Control Number79102069


Share this book
You might also like
Pewter for living.

Pewter for living.

Rev. John Mayo and his descendants

Rev. John Mayo and his descendants

I&EC. Industrial and engineering chemistry

I&EC. Industrial and engineering chemistry

Designed for living Corning cookbook

Designed for living Corning cookbook

The maids tragedy

The maids tragedy

Must we fight?

Must we fight?

Maximizing the use of past performance in source selection

Maximizing the use of past performance in source selection

Becoming a Chef Revised and Professional Chef 7e Set

Becoming a Chef Revised and Professional Chef 7e Set

Coming out of your grave clothes

Coming out of your grave clothes

The old homestead

The old homestead

SOGS, Southeastern Ontario Geological Survey

SOGS, Southeastern Ontario Geological Survey

Tolleys indemnities and warranties

Tolleys indemnities and warranties

Filing for engineering drawings and maps

Filing for engineering drawings and maps

Life beyond death in the beliefs of mankind

Life beyond death in the beliefs of mankind

Select minor poems of John Milton

Select minor poems of John Milton

Occupations for trained women in Canada.

Occupations for trained women in Canada.

Preliminary feasibility report on augmenting Maskeliya Oya catchment for additional energy production Download PDF EPUB FB2